Skip to Content
NWCouncil.org Contact
About
Membership Decisions on measures Requests for Proposals Guidelines Administrative Resources
Meetings
Work products
Energy Efficiency Measures Demand Response Products Whole Building Efforts Tools and Resources Research and Market Analysis
Subcommittees
AgriculturalBehaviorCommercial and Industrial (non-HVAC and WH)Commercial HVAC and Water HeatingConnected ThermostatsDemand ResponseDistribution EfficiencyGuidelinesImplementersModelingNatural GasNew HomesNon-Residential LightingOperationsRefrigerationResearch and EvaluationResidential AppliancesResidential HVAC and Water HeatingSmall and Rural UtilitiesWeatherizationWhole Building
ABOUT
Membership Requests for Proposals Guidelines Administrative Resources
MEETINGS
WORK PRODUCTS
Energy Efficiency Measures Demand Response Products Whole Building Efforts Tools and Resources Research and Market Analysis
SUBCOMMITTEES
  1. /

  • Home
  • Calendar
  • Work products
  • Subcommittees
  • Decisions
  • Archives
  • About the RTF

Decisions

Date
Description
Related Measures and Standard Protocols
June 23, 2026
Approve Measure Updates

Approve the Multi-family Weatherization UES:
-Remove the tax credit
-Change the measure name to Weatherization Low-rise Multi-family
-Keep the Category at Small Saver, Planning
-Keep the Status at Active
-Set the sunset date to June 30, 2029 

Weatherization Low-Rise Multi-Family
June 23, 2026
Deactivate Measure

Deactivate the Compressor Head Fan Motor Retrofit UES 

Compressor Head Fan Motor Retrofit to ECM
June 23, 2026
Adopt Research Strategy

Approve updates to the Research Strategy for Agricultural Irrigation Hardware Maintenance and Upgrades as presented. 

Irrigation Hardware Maintenance, Irrigation Hardware Upgrades
May 19, 2026
Approve Measure Updates

Approve the Irrigation Hardware Maintenance as presented, and:

• Change Category to Planning
• Keep the Status Active
• Set the sunset date to October 31, 2028
• Reduce uniformity savings adjustment to 15%

Irrigation Hardware Maintenance
May 19, 2026
Approve Measure Updates

Approve the Walk-in Evaporator Fan Motor Controller as presented, and:

• Keep the Category at Small Saver
• Keep the Status at Active
• Set the sunset date to May 31, 2031

Walk-in Evaporator Fan Motor Controllers
May 19, 2026
Approve Measure Updates

Approve the Single Family Weatherization UES and Manufactured Homes Weatherization UES, and:
 • Remove the tax credit
 • Change the measure name to Weatherization Single Family UES and Weatherization Manufactured Home UES
 • Keep the Category at Planning
 • Keep the Status at Active
 • Set the sunset date to May 31, 2029

Weatherization Single Family, Weatherization Manufactured Home
May 19, 2026
Extend Sunset Dates

Extend the sunset dates of the Residential Heat Pump Water Heaters UES and the Consumer Heat Pump Water Heater in Commercial Applications UES measures to July 31, 2026

Consumer Heat Pump Water Heater in Commercial Applications, Residential Heat Pump Water Heaters
May 19, 2026
Extend Sunset Date

Extend the sunset date of the Level 2 Electric Vehicle Chargers UES to September 30, 2026.

Level 2 Electric Vehicle Chargers
April 21, 2026
Approve Measure Updates

 Approve the Residential Gas Water Heater UES as presented, and:
• Keep the Category at Proven
• Keep the Status at Active
• Set the sunset date to April 30, 2031

Residential Gas Water Heaters
April 21, 2026
Approve Measure Updates

Combine the Display Case Evaporator Fan Motor Retrofit UES and the Walk-in Evaporator Fan Motor Retrofit UES into the Commercial Refrigeration Evaporator Fan Motor UES and update the measure as presented, and:
Add an upgrade option using the same current practice baseline as the pre-condition measure's second period
Set the Category at Proven
Set the Status at Active
Set the sunset date to April 30 2031 

Commercial Refrigeration Evaporator Fan Motor, Display Case Evaporator Fan Motor Retrofit
April 21, 2026
Extend Sunset Date

Extend the sunset date of the New Homes Standard Protocol to July 31, 2026

New Homes Standard Protocol
April 21, 2026
Extend Sunset Dates

Extend the sunset date of the
• Walk-in Evaporator Fan Motor Controller and Compressor Head Fan Motor Retrofit UESs to June 30, 2026
• Residential Dryers UES to September 30, 2026. 

Compressor Head Fan Motor Retrofit to ECM, Walk-in Evaporator Fan Motor Controllers, Residential Dryers
April 21, 2026
Allocate or Don't Allocate Resources to Developing Potential Measures

Allocate resources to developing the potential measures for:
– Low Rise Multifamily Air Sealing
– Pool Heaters
– Demand Control Ventilation (non-kitchen applications)

• Do not allocate resources to the following:
– LED Grow Light and Controls
– Pool Covers

April 21, 2026
Approve Measure Updates

Approve the Efficient Pumps UES as presented, and:
• Update the costs to the lastest DOE TSD
• Keep the Category at Proven
• Keep the Status at Active
• Set the sunset date to April 30, 2031

Efficient Pumps
March 17, 2026
Extend Sunset Date

Extend the sunset date of the Irrigation Hardware Upgrades UES to May 31, 2026. 

Irrigation Hardware Upgrades
March 17, 2026
Extend Sunset Date

Extend the sunset date of the Irrigation Hardware Maintenance UES to May 31, 2026.

Irrigation Hardware Maintenance
March 17, 2026
Extend Sunset Date

Extend the sunset date of the Ductless Heat Pump for Forced Air Furnace SF and MH UES and Ductless Heat Pump for Zonal Heat MH and SF UES to December 31, 2026.

Ductless Heat Pumps for Zonal Heat MH and SF, Ductless Heat Pump for Forced Air Furnace SF and MH
February 18, 2026
Approve Measure Updates

Approve the update of the Commercial Clothes UES measure as presented, and:
-Update the measure specification
-Set the Category as Small Saver
-Set the Status as Active
-Set the sunset date to January 30, 2030.

Commercial Clothes Washers
January 21, 2026
Extend Sunset Date

Set the sunset date for the Residential Heat Pump Water Heaters and Consumer Heat Pump Water Heaters in Commercial Application UESs to May 31, 2026

Consumer Heat Pump Water Heater in Commercial Applications, Residential Heat Pump Water Heaters
January 21, 2026
Approve Demand Response Product Updates

Approve the Residential Level 2 Electric Vehicle Charger Demand Response Product workbook, as presented, and set the review date of January 31, 2029

Level 2 AC Electric Vehicle Chargers
January 21, 2026
Adopt New Measure

Adopt the Residential Induction Cooktops and Ranges UES measure as presented, and:
-Set the Category as Proven
-Set the Status at Active
-Set the sunset date to January 30, 2030

Residential Induction Cooktops and Ranges
December 09, 2025
Extend Sunset Date

Extend the sunset date for the Centrally Ducted Air Source Heat Pumps Upgrades and Conversation UES measure to December 31, 2026.

Centrally Ducted Air Source Heat Pump Upgrades and Conversions
December 09, 2025
Extend Sunset Date

Extend the sunset date of the Residential Dryers UES measure to April 30, 2026.

Residential Dryers
December 09, 2025
Extend Sunset Date

Extend the sunset date of the New Homes Standard Protocol measure to April 30, 2026. 

New Homes Standard Protocol
December 09, 2025
Approve Measure Updates

Approve the updates to the Residential Clothes Washers UES measure as presented:
• Current practice: update to newest NEEA RPP data
• Fuel shares- Mix of gas and electric dryers and hot water heaters for the Any Dryer Any Hot Water measure
application: update to RBSA 2022
• Savings Shapes- Washer, Water Heater, and Dryer: update using HEMS v7 dryer shape and offset
• Incremental cost: update to new online retail review
• Incremental repair cost: update to new DOE TSD
• Measure life: update to new DOE TSD
and:
• Keep the Category at “Proven”
• Keep the Status at “Active”
• Set the sunset date to December 31, 2030 

Residential Clothes Washers
December 09, 2025
Approve Measure Updates

Approve updates to the Commercial Boilers UES measure as presented:
– Add measure identifier for Project Type
– Update savings estimates to align with updates to Standard Protocol
and:
– Keep the Category at Small Saver
– Keep the Status at Active
– Set the sunset date to November 30, 2030.

Commercial Boilers
November 13, 2025
Adopt Research Strategy

Approve the Commercial Dishwasher UES research strategy as presented.

Commercial Dishwashers
November 13, 2025
Approve Standard Protocol Updates and Extend Sunset Date

Approve the updates to the Commercial Boilers Systems Standard Protocol:
-Update current practice to 90% condensing where non-condensing is an option
-Refine methods of using CBECs data for EUIs and benchmark to CBSA
-Change binning method in consumption analysis
-Improve functionality of demonstration calculator
-Keep the Status at Active
-Set the Sunset Date to November 30, 2030

Commercial Boiler Systems
November 13, 2025
Approve Demand Response Product Workbook and Set Sunset Date

Approve the Agricultural Irrigation Demand Response Product workbook as presented and set a review date of October 31, 2028. 

Irrigation Pump Controls
November 13, 2025
Extend Sunset Date

Set the sunset date Commercial Boilers UES to December 31, 2025.

Commercial Boilers
October 21, 2025
Approve Measure Updates

Approve the Irrigation Hardware Upgrades UES as presented, and:
• Average of 2013 and 2018 F&R survey hours of use for Montana
• Average of 2018 and 2022 F&R survey for lift, operating pressure, and % surface water
• Change high pressure sprinkler efficiency to 65% and MDI to 97%
• Keep the Planning Category
• Keep the Active Status
• Set the sunset date to October 31, 2028 

Irrigation Hardware Upgrades
October 21, 2025
Deactivate Measure

Deactivate the Commercial Secondary Glazing Systems UES measure.

Commercial Secondary Glazing Systems
October 21, 2025
Approve New Measure

Approve the Commercial Dishwashers UES measure as presented, and:
• Update 90/10 non-condensing/condensing water heaters split
• Adjust school savings shape to reduce June and August operation by half, 180 days total
• Set the Category as Planning
• Set the Status at Active
• Set the sunset date to April 30, 2027

Commercial Dishwashers
September 16, 2025
Approve Recommendation of 2026 Work Plan

Adopt the proposed 2026 work plan and business plan, with recommendation to the Council for approval.

All Measure Applicable
September 16, 2025
Approve Measure Updates

Approve the Door Sweeps UES as presented, and:
• Keep the Status as Active
• Keep the Category at Planning
• Update Research Stategy
• Set the sunset date to 9/30/2028

Door Sweeps
September 16, 2025
Change Measure Status and Approve Measure Updates

Approve the Connected Thermostat UES as presented, and:
• Take the average of the Intermountain and Avista Evaulations and set as HZ2 gFAF savings and the remaining three evaluations for HZ 1.
-Deactivate the CDHP direct install with resistance optimization applications
-Set the savings fro CDHP retail and direct install without electric resistance optimization applications to zero.
-Change the Category to Planning for the SF/MH, Gas-heated homes, HZ 1, retail & direct install applications
• Keep the category at Planning for all other Active applications
• Change the Status to Active
• Set the sunset date to September 30, 2026

Connected Thermostats
September 16, 2025
Deactivate Measure

Deactivate the Residential Gas Fireplaces UES measure.

Residential Gas Fireplaces
September 16, 2025
Change Measure Status and Approve Measure Updates

Extend the sunset date to September 30, 2028 to allow time for review of the upcoming Bonneville evaluation, set measure status to Under Review, update labor rates to align with the current SIW, set savings to zero.

Residential Electronic Line Voltage Thermostats
August 19, 2025
Approve Measure Updates

Update the current practice from 50% to 34% for the ENERGY STAR Commercial Refrigerators and Freezes UES 

ENERGY STAR Commercial Refrigerators and Freezers
August 19, 2025
Approve Measure Updates

Approve updates to the Commercial DHP in Existing Buildings UES measure as presented and:
-Update measure eligibility to 4 tons maximum capacity
-Keep the Category at Planning,
-Keep the Status at Active,
-Set the sunset date to August 31, 2028

Commercial DHP in Existing Buildings
August 19, 2025
Update Measure Status and Extend Sunset Date

Approve the proposed edits to the Residential Central Air Conditioners UES measure as presented, and:
-Keep the Category at Planning
-Change the Status to Active (from Under Review)
-Set the sunset date to August 31, 2027

High Efficiency Residential Central Air Conditioners
July 22, 2025
Approve Standard Protocol Updates

Approve updates ot the Voltage Optimization Standard Protocol as presented, and:
Keep the Status at Active
Modify the customer-side CVR-f by a factor of 0.86
Add default savings values for utility-side savings, 10% of customer side savings
Set the sunset date to July 31, 2027 

Voltage Optimization
July 22, 2025
Approve Measure Updates

Keep the Category at Planning
Review heating interactions load shape
Add track lighting changes to research strategy                                
Keep the Status at Active
Set the sunset date to July 31, 2028

Retrofit Doors on Existing Display Cases
July 22, 2025
Deactivate Measure

Deactive the School Weatherization UES

School Weatherization
July 22, 2025
Update Measure Status and Extend Sunset Date

Change the status from "Active" to "Under Review" and set the sunset date to January 31, 2026

Consumer Heat Pump Water Heater in Commercial Applications, Residential Heat Pump Water Heaters
June 17, 2025
Approve Measure Updates

Deactivate the screened applications of the Ductless Heat Pump Zonal Heat MH and SF measure.

Ductless Heat Pumps for Zonal Heat MH and SF
June 17, 2025
Approve Measure Updates

Approve Anti-Sweat Heater Controls UES as presented, and:
Keep the Category at Small Saver
Keep Status at Active
Set the sunset date to June 30, 2030.

Anti-Sweat Heater Controls
June 17, 2025
Extend Sunset Date

Extend the sunset date of the Retrofit Doors on Existing Display Cases to July 31, 2025.

Retrofit Doors on Existing Display Cases
June 17, 2025
Adopt Research Strategy

Adopt the Ductless Heat Pump One-to-One UES Research Strategy as presented.

Ductless Heat Pump One-to-One
June 17, 2025
Approve Measure Updates

Approve the measure and: 
Keep the status at Active
Keep the category at Planning
Update the costs
Change the name to Duct Sealing MH.
Set the sunset date to June 30, 2027.

Duct Sealing MH
June 17, 2025
Approve Measure Updates

Approve the measure as presented, and:
Keep the status at Active
Keep the category at Planning
Update costs as presented
Set the sunset date to June 30, 2027 

Duct Sealing SF
June 17, 2025
Deactivate Measure

Deactivate the ENERGY STAR Refrigerated Beverage Vending Machines UES.

ENERGY STAR Refrigerated Beverage Vending Machines
May 22, 2025
Extend Measure Sunset Date

Extend the sunset date for Consumer Heat Pump Water Heaters in Commercial Applications UES to July 31, 2025.

Consumer Heat Pump Water Heater in Commercial Applications
May 22, 2025
Approve Measure Updates

Approve update to the cost methodology for Batch (B) Ice Making Head (IMH) 800+lb/24h of the ENERGY STAR Ice Makers UES as presented 

ENERGY STAR Ice Makers
May 22, 2025
Adopt New Measure

Adopt the Ductless Heat Pump One-to-One UES measure as presented, and:
Set the Category to Planning for Single Family and Small Saver for Manufactured Homes
Set the Status to Active
Set the sunset date to May 31, 2028 

Ductless Heat Pump One-to-One
May 22, 2025
Approve Measure Updates

Approve the updates to the research strategy for the Commercial and Industrial Fans UES as presented, and:
Keep measure category at Planning,
Keep measure status at Active
Keep measure sunset date of April 2027

Commercial and Industrial Fans
May 22, 2025
Approve Measure Updates

Change the Category to Proven and set the sunset date to May 31, 2030 for the ENERGY STAR Commercial Refrigerators and Freezers UES.

ENERGY STAR Commercial Refrigerators and Freezers
May 22, 2025
Extend Sunset Date

Extend the sunset date for the Residential Heat Pump Water Heaters UES to July 31, 2025.

Residential Heat Pump Water Heaters
April 15, 2025
Approve Measure Updates

Approve the updates to the C&I Fans UES measure as presented and:
- Keep the Category at Planning
- Keep the Status at Active
- Set the sunset date to April 30, 2027
-Have CAT bring proposed revisions to the Research Strategy to the RTF at the May 22, 2025 RTF meeting. 

Commercial and Industrial Fans
April 15, 2025
Deactivate Measure

Deactivate the Residential Air Purifiers UES measure.

Residential Air Purifiers
April 15, 2025
Extend Measure Sunset Date

Extend the sunset date of the Residential Electronic Line Voltage Thermostats UES measure to September 30, 2025.

Residential Electronic Line Voltage Thermostats
March 18, 2025
Extend Measure Sunset Date

Extend the sunset date to October 31, 2025 for Irrigation Hardware Upgrades UES.

Irrigation Hardware Upgrades
March 18, 2025
Extend Measure Sunset Date

Move that the RTF extend the sunset date for the High Efficiency Residential Central Air Conditioner UES measure to August 31, 2025.

High Efficiency Residential Central Air Conditioners
March 18, 2025
Approve Measure Updates

Approve the ENERGY STAR Commercial Refrigerators and Freezers as presented, and:
• Update the Category to Planning
• Add a research strategy
• Keep the Status at Active
• Set the sunset date to December 31, 2028.

ENERGY STAR Commercial Refrigerators and Freezers
March 18, 2025
Deactivate Measure

Deactivate Commercial Unitary Heat Pump Water Heaters UES

Commercial Unitary Heat Pump Water Heaters
March 18, 2025
Extend Measure Sunset Date

Extend the sunset date to November 30, 2026 for the Commercial Connected Thermostat UES.

Commercial Connected Thermostats
February 20, 2025
Approve Measure Updates

Extend the sunset date to October 31, 2025 

Commercial Secondary Glazing Systems
January 23, 2025
Approve Measure Updates

Move that the RTF approve the ENERGY STAR Ice Makers UES  as presented, and:
• Update the Category to Proven
• Keep the Status at Active
• Set the sunset date to January 31, 2030 

ENERGY STAR Ice Makers
January 23, 2025
Approve Measure Updates

Move that the RTF approve the Non-Residential Lighting Retrofits Standard Protocol as presented, and:
• Keep the Active Status
• Set the sunset date to January 31, 2027

Non-Residential Lighting Retrofits
January 23, 2025
Approve Sunset Date Extension

Move that the RTF extend the sunset date to April 30, 2025 for the Commercial & Industrial Fans UES measure.

Commercial and Industrial Fans
January 23, 2025
Approve Updated Sunset Date

-Extend the sunset date to September 30, 2025
-Change the Status to Under Review

Connected Thermostats
December 17, 2024
Approve Updates to the Standard Information Workbook

Approve the updates to the Standard Information Workbook, as presented for the following tabs:​
Labor Rates​
Water and Wastewater Rates​
Water Energy​

All Measure Applicable
December 17, 2024
Deactivate Measure

Deactivate the pin-based lamps portion of the Residential Lighting UES Measure and deactivate the integral-LED fixtures portion of the Residential Lighting UES

Residential Lighting
December 17, 2024
Approve Measure Updates

Approve Non-Residential Midstream Lighting as presented, and​
Keep the Category of Proven​
Keep the Active Status​
Set the sunset date to December 31, 2026

Non-Residential Lighting Midstream
December 17, 2024
Allocate or Don't Allocate Resources to Developing Potential Measures

Allocate resources to developing the potential measures for​
Heat Pump Engine Block Heaters for Standby Generators​
Commercial Dishwashers​

And that the RTF does not allocate resources to the following:​
Whole House Fans​
Midstream Ductless Heat Pumps
ENERGY STAR Ceiling Fans​​

Commercial Dishwashers, Heat Pump Engine Block Heaters for Standby Generators
December 17, 2024
Extend Sunset Dates

Approve the sunset date extensions as follows:​
MH Duct Sealing UES to June 30, 2025​
Door Sweeps UES to September 30, 2025​
Residential Heat Pump Water Heaters UES to May 31, 2025​
Consumer HPWHs in Commercial Applications UES to May 31, 2025

Duct Sealing MH, Consumer Heat Pump Water Heater in Commercial Applications, Door Sweeps, Residential Heat Pump Water Heaters
November 19, 2024
Approve Measure Updates

Approve the updates to the New Manufactured Homes and HVAC UES measure and Research Strategy as
presented
• Add in the DHP tax credit with appropriate measure identifiers
• Change the status from to “Under Review” to “Active”
• Change the category of NEEM v2.0 measure applications to “Small Saver”
• Change the category of NEEM v1.1 + ZERH v1 and HP Upgrade measure applications to:
– “Proven” for CDHP in HZ1
– “Planning” for CDHP in HZ 2 and 3
– “Proven” for DHP in HZ 1 and 2
– “Planning” for DHP in HZ 3
– “Small Saver” for HE Gas Furnace
• Approve updates to CDHP and DHP for eFAF Research Strategies that point to their use in the New MH and
HVAC measure
• Set the sunset date to November 30, 2026

New Manufactured Homes and HVAC
November 19, 2024
Approve Measure Updates

Approve the updates to the Residential Refrigerator and Freezer UES as presented, and:
• Keep the Category at Proven
• Keep the Status at Active
• Keep the sunset date on March 31, 2027

Residential Refrigerators and Freezers
November 19, 2024
Approve Measure Updates

Approve the Residential Gas Furnaces measure as presented, and:
• Change the Category to Planning
• Keep the Status at Active
• Set the sunset date to November 30, 2028 

Residential Gas Furnaces
November 19, 2024
Approve Updates to Standard Information Workbook

Approve the updates to the Standard Information Workbook, as presented for the following tabs:
• GDP Deflator
Direct CAT to work with RTF Members and stakholders for updated proposal in Labor rates

All Measure Applicable
October 16, 2024
Approve Measure Updates

Approve the Ductless Heat Pumps for Multifamily UES as presented, and:
-Keep the Category at Planning
-Keep the Status at Active
-Set the sunset date to September 30, 2028.

Ductless Heat Pumps for Multifamily
October 16, 2024
Approve Measure Updates

Approve the updates to Ductless Heat Pumps for Zonal Heat Single Family and Manufactured Homes UES as presented, and:
-Keep the Category at Proven
-Keep the Status at Active
-Set the sunset date to March 31, 2026.

Ductless Heat Pumps for Zonal Heat MH and SF
October 16, 2024
Extend Measure Sunset Dates

Extend the sunset date to June 30, 2025 for Retrofit Doors on Existing Display Cases UES and Residential Air Purifiers UES 

Retrofit Doors on Existing Display Cases, Residential Air Purifiers
October 16, 2024
Approve Recommendation of 2025 Work Plan

Adopt the proposed 2025 work plan and business plan, with recommendation to the Council for approval.

All Measure Applicable
October 16, 2024
Approve Measure Updates

Approve the Fryers UES as presented, and:
-Set the Category to Proven for gas and keep the Category as Small Saver for electric
-Keep the Status at Active
-Set the sunset date to May 31, 2028.

Fryers
October 16, 2024
Deactivate Measure

Deactivate the Strip Curtains UES.

Strip Curtains
October 16, 2024
Approve Measure Updates

Approve the addition of a tax credit identifier with the associated cost implications for the DHP for Electric Forced Air Furnaces Manufactured and Single-Family Homes UES as presented.

Ductless Heat Pump for Forced Air Furnace SF and MH
September 17, 2024
Extend Measure Sunset Date

Extend the sunset date for the DHP for Multifamily UES to October 31, 2024

Ductless Heat Pumps for Multifamily
September 17, 2024
Approve Updates to Standard Information Workbook

Approve updating the Standard Information Workbook with the proposed Refrigeration System Marginal Ratios expressed in BTU per W to replace the Energy Effiicency Rations in the current workbook.

All Measure Applicable
September 17, 2024
Approve Measure Updates

Approve the DHP for Electric Forced Air Furnaces (Single Family and Manufactured Homes) UES as presented, and:
-Keep the Category at Proven for HZ 1 and 2 and Planning for HZ 3
-Keep the status at Active
-Set the sunset date to March 31, 2026. 

Ductless Heat Pump for Forced Air Furnace SF and MH
September 17, 2024
Approve Measure Updates

Approve the Griddles UES as presented, and:
Update the Category to Small Saver
Keep the Status at Active
Set the sunset date to May 31, 2028

Griddles
September 17, 2024
Extend Measure Sunset Date

Extend the sunset date for the High Efficiency Residential Central Air Conditioner UES measure to March 31, 2025. 

High Efficiency Residential Central Air Conditioners
August 20, 2024
Approve Standard Information Workbook Updates

Approve the updates to the Standard Information Workbook V5.0 as presented and
-update the weighting factors to make sure Montana represents only in-region portion
-on Electricity Rates tab show both current year dollars and 2026$s
-Remove kWh to ton-hour from Conversion Factors

All Measure Applicable
August 20, 2024
Approve Sunset Date Extension

Extend the sunset date for the New Homes Standard Protocol to December 31, 2025 and change the status to Under Review.

New Homes Standard Protocol
August 20, 2024
Approve Measure Updates

Approve the updates to the baseline for the <15 pans and 15-28 pans categories of the Combination Oven UES.

Combination Ovens
August 20, 2024
Approve Sunset Date Extension

Extend the sunset date of the Small Commercial DHP UES to August 31, 2025

Commercial DHP in Existing Buildings
July 23, 2024
Approve Sunset Date Extensions

Approve the sunset date extensions to November 30, 2024 for Strip Curtains UES and Residential Gas Furnaces UES

Strip Curtains, Residential Gas Furnaces
July 23, 2024
Approve Measure Updates

Approve the the Steamers UES as presented and: Remove Oregon from the measure application, keep the status at active, keep the category as small saver, and set the sunset date to May 31, 2028

Steamers
July 23, 2024
Approve Measure Updates and Name Change

Approve the Air Source Heat Pump Upgrades and Conversions for Single-family and Manufactured Homes UES as presented, and:
No cost differential between HZ1 and HZ2/3
Change to apply a tax credit to the upgrades but keep the idenitifiers
Change the name to “Centrally Ducted Air Source Heat Pump Upgrades and Conversions”
Keep the Category at Proven for SF and MH for HZ1 and Planning for MH HZ2/3 for Conversions
Change the Category to Proven for SF HZ2/3 Conversions
Keep the Category at Planning for all Upgrade options
Keep the Status at Under Review for Upgrades and Conversions
Set the sunset date to December 31, 2025 

Centrally Ducted Air Source Heat Pump Upgrades and Conversions
July 23, 2024
Approve Measure Updates

Approve Doorway Air Curtains, as presented:

Following update and approval of Standard Information Workbook, update the EER values and any other SIW updates for this measure and report results to RTF at future meeting
Update name of measure to Refrigerated Doorway Air Curtains
Change the research strategy primary objective to include measurement of air barrier effectiveness
Keep the Category of Planning
Keep the Active Status
Set the sunset date to July 31, 2027

Refrigerated Doorway Air Curtains
1 2 3 4 5 6 7 8 9 10 next › last »

AN ADVISORY COMMITTEE OF:

Northwest Power & Conservation Council

© Regional Technical Forum

ARCHIVES  •  ELCAP