| | File type | Last updated |
Appendix A | RTF Work Products Needed to Facilitate BPA's C & RD | 40K Word | Sep 00 |
Appendix B | Charter of the RTF | 60k Word | Sep 00 |
Appendix C | RTF Member List | 30k Word | July 01 |
Appendix D | Plan and Schedule | image | Sep 00 |
Appendix E | Conservation Measures & Activities Eligible for C & RD | HTML | Sep 00 |
Appendix F | Qualifying Renewable Resource Measures & Activities | 90k Word | Sep 00 |
Appendix G | Value of Diverted Water in the Columbia Basin | 50k Word | Sep 00 |
Appendix H | Air Source Heat Pump System Installation Standards | 68k Word | July 01 |
Appendix I | Geothermal Heat Pump Design and Installation | 50k Word | July 01 |
Appendix J | Value of Cons. Standards. And Renewable Res. Net Energy Prod. Analysis Tool: Procost | 90k Word | Sep 00 |
Appendix K | Conservation Load Shapes | 60k PDF | Sep 00 |
Appendix L | Deemed Measure Tables - Residential | 2.5m Excel | Apr 01 |
Appendix M | Deemed Measure Tables - Commercial | 992k Excel | July 01 |
Appendix M1, part 1 | Deemed Energy Savings Calculation Methodology for Lighting Retrofits | 480k Excel | July 01 |
Appendix M1, part 2 | Deemed Energy Savings Calculation Methodology for New Construction Lighting Projects | 480k Excel | July 01 |
Appendix N | Industrial Sector Deemed Measure Summary | 492k Excel | July 01 |
Appendix O | Deemed Energy Savings and Valuation Methods - Irrigated Agriculture | 300k Excel | Sep 00 |
Appendix P | Protocols for Estimating Energy Savings and Value for Non-Deemed Conservation | 125k Word | Sep 00 |
Appendix Q | Protocols for Estimating the Energy Production of Un-metered Renewable Resources | 90k Word | Sep 00 |
Appendix R | Conservation and Renewable Resources Discount Program Application and Reporting Software | 70k Word | Sep 00 |
Appendix S | Other Sector Deemed Measure Summary | 67k Excel | July 01 |