Commissioning, Controls, & Sizing MH

The RTF is a technical advisory committee to the Northwest Power and Conservation Council established in 1999 to develop standards to verify and evaluate energy efficiency savings

NWCouncil.org Contact
Calendar
Work products
UES Measures Standard protocols list Demand Response Technologies Supporting Documents Propose a measure or standard protocol Proposed measures and status Whole Building Efforts
Subcommittees
  • Commercial HVAC
  • Connected Thermostats
  • Demand Response
  • Duct Sealing
  • Guidelines
  • Heat Pump Water Heaters
  • Implementers Group
  • Modeling
  • Natural Gas
  • New Homes
  • Non-Residential Lighting
  • Operations
  • Refrigeration
  • Research and Evaluation
  • Residential HVAC
  • RTF Policy Advisory Committee
  • Small and Rural Utilities
  • Weatherization
  • Whole Building
Home Calendar News and updates Decisions Guidelines

About the RTF

  • RTF Membership - 2025-2027
  • Work plan and budget
  • Request for proposals
  • Charter and bylaws
  • Conflict of interest policy
  • RTF Policy Advisory Committee
  • Contacts
  • Conservation achievements

Work Products

UES Measures Standard protocols list Demand Response Technologies Supporting Documents Propose a measure or standard protocol Proposed measures and status Whole Building Efforts

Subcommittees

  • Commercial HVAC
  • Connected Thermostats
  • Demand Response
  • Duct Sealing
  • Guidelines
  • Heat Pump Water Heaters
  • Implementers Group
  • Modeling
  • Natural Gas
  • New Homes
  • Non-Residential Lighting
  • Operations
  • Refrigeration
  • Research and Evaluation
  • Residential HVAC
  • RTF Policy Advisory Committee
  • Small and Rural Utilities
  • Weatherization
  • Whole Building
Close Navigation
  1. /

UES Measure

  • Commissioning, Controls, & Sizing MH

Commissioning, Controls, & Sizing MH

At a Glance

Category 
none
Status 
deactivated
Sector 
residential
Applications 
heating/cooling

The Commissioning, Controls & Sizing for Single Family and Manufactured Homes measures were deactivated at the January 2020 RTF meeting. The ASHP measures still account for some existing CC&S. The RTF intends to consider other versions of this measure in the future.

Workbook

Latest Version

ResMHHeatingCoolingCommissioningControlsSizing_v3_3.xlsm

File ResMHHeatingCoolingCommissioningControlsSizing_v3_3.xlsm
QC review complete.
Date 
Dec 5, 2016
Version number 
3.3

Past Versions

version date document
3.2
Jun 29, 2016
File ResMHHeatingCoolingCommissioningControlsSizing_v3_2.xlsm
Updated to 7th Plan assumptions and format. Currently undergoing QC.
3.1
Feb 01, 2016
File ResMHHeatingCoolingCommissioningControlsSizingv3_1.xlsm
QC Review Complete
3.0
Aug 28, 2015
File ResMHHeatingCoolingCommissioningControlsSizing_v3.xlsm
Workbook currently undergoing QC.
2.5
Oct 24, 2012
File ResMHPTCSCommissioningControlsSizing_v2_5.xls
Added summary sheet.
2.4
May 30, 2012
File Res_MHHeatPumpsFY10v2_4.xls
Clarified that measure is applicable to single and two-speed compressors.
2.3
Mar 13, 2012
File Res_MHHeatPumpsFY10v2_3.xls
Updated per 2/14/2012 RTF decision to include new construction in measure application.
2.1
Sep 27, 2010
File Res_MHHeatPumpsFY10v2_1.xls
Original savings workbook.
Supporting Documents
File HP Sizing Calculator_Heating Only_v2_Unlocked and Unhidden_3.xlsm
File HP Sizing Calculator_Heating Only_v2_Unlocked and Unhidden_5.xlsm
File ResCCSSpec-v4_1.docx
File ResCCSSpec_v4_0.docx
File CommissioningControlsSizingSpecification201412_v3.docx
File SEEMruns_SingleFamilyExistingHVACandWeatherization_July2015.xlsm
File ManufacturedHomesWxSEEMWorkbookRuns05052015 .xlsm
File Existing Residential Manufactured Home SEEM94 Runs 03a
File Existing Residential Manufactured Home SEEM94 Runs 03
File Existing Residential Manufactured Home SEEM Runs 02
File Research Plans: New Category DHP with FAF CC and S rev4 (3/15)
File Research Strategy CCS 2016
File Residential Manufactured Home Heat Pump Related Measures Research Strategy v1.1

Decisions

Expand All Decisions

Latest decision

Decision details

Decided 
January 22, 2020
RTF Meeting: January 22, 2020

Deactivate Measure

Decision Details

Deactivate the SF and MH Commissioning, Controls and Sizing UES measure and consider any future new measure proposal from utility stakeholders. 

Decided 
November 19, 2019
RTF Meeting: November 19, 2019

Extend Sunset Date

Decision Details

Extend the sunset date for the following measures to January 31, 2020:

  • Air Source Heat Pump Upgrades SF
  • Air Source Heat Pump Upgrades and Controls MH
  • Commissioning, Controls and Sizing MH
  • Commissioning, Controls and Sizing SF
Decided 
June 18, 2019
RTF Meeting: June 18, 2019

Extend Sunset Dates

Decision Details

Extend the sunset date for the Floating Head Pressure Controls UES to September 2019
Extend the sunset date for the following measures to November 2019:

  • ASPH upgrades SF
  • CC&S SF
  • ASHP Upgrades and Conversions MH
  • CC&S MH
  •  MH Weatherization (Heat Pumps)
  • DHP in Zonal Electric Resistance Homes SF
  • DHP in Zonal Electric Resistance Homes MH
  • SF Weatherization 

 

Decided 
May 22, 2018
RTF Meeting: May 22-23, 2018

Extend measure sunset dates

Decision Details

Extend the sunset date for the following measures to January 31, 2019:

  • MH Weatherization (heat pumps)
  • MH ASHP Upgrades
  • MH ASHP Conversions
  • MH ASHP Commissioning, Controls, and Sizing
Decided 
August 18, 2015
RTF Meeting: August 18, 2015

Approve measure update

Decision Details

Approve the following Manufactured Home measure analyses and Research Strategy: Heat Pump Conversions, Heat Pump Upgrades, Commissioning Controls & Sizing (CC&S) and Performance Based Duct sealing. Set the Category for measures to "Planning" ; Set the Status to "Active"; Set the sunset date to August 31, 2018.

Decided 
May 12, 2015
RTF Meeting: May 12, 2015

Approve measure update

Decision Details

Adopt the delivery verification guidance, and related specification changes, as presented and with a 30 day review period, for the following measures:Residential Weatherization (SF and MH); Residential Performance Based Duct Sealing (SF and MH); Residential Commissioning Controls and Sizing (SF and MH).

Decided 
April 14, 2015
RTF Meeting: April 14, 2015

Approve measure update

Decision Details

Change the status from 'Active' to 'Under Review' for the Residential Weatherization MH;Residential Commissioning Controls & Sizing MH; and Residential New Construction High Performance Manufactured Homes.

Decided 
March 17, 2015
RTF Meeting: March 17, 2015

Approve measure update with direction for future analysis

Decision Details

Accept the research strategy (slide 19) for the Residential Heat Pump Commissioning Controls and Sizing MH UES measure. Set the Category to 'Planning', Status to 'Active' and sunset date to March 2016.

The 1-year sunset date is intended as a check-in on the research plan process, not a revisit of the measure workbook. Since the check-in process (with the R&E subcommittee) is new and still under development, the RTF was not comfortable with a longer sunset date.

Decided 
July 15, 2014
RTF Meeting: July 15, 2014

Approve measure update

Decision Details

Approve staff proposal for PTCS Commissioning Controls & Sizing to extend the Sunset date to December 2014. Move measure to planning, under review, and draft a research plan for this measure.

Decided 
November 19, 2013
RTF Meeting: November 19, 2013

Sunset date extension

Decision Details

Accept staff’s proposed plan to bring the Out-of-Compliance UES measure into compliance and to extend the sunset date to July, 2014.

Decided 
October 24, 2012
RTF Meeting: October 24, 2012

Set measure to Out of Compliance

Decision Details

Adopt the SBW recommendations for the Residential Manufactured Housing Performance Tested Comfort Systems (PTCS) Commissioning, Controls and Sizing measure and change the status to Out of Compliance with a sunset date of November 1, 2013.

RTF staff will work with stakeholders to develop a plan to bring the measure back into compliance with the Guidelines based on the recommendation memo and seek RTF approval of that plan by the sunset date. If a plan is not approved by the RTF by the sunset date, the measure will be deactivated.

Decided 
May 15, 2012
RTF Meeting: May 15, 2012

Direction for further analysis

Decision Details

Clarify eligibility requirements for (central system) heat pump UES measures so as to limit eligibility to single speed and two speed compressor systems.

BPA is planning lab and field tests of the new generation of central heat pumps with variable speed compressors. Results are expected in 2013, at which time the RTF may review a proposal for a UES measure for those units. In-situ duct system efficiency is the primary unknown at this point.

Decided 
February 14, 2012
RTF Meeting: February 14, 2012

Approve measure update with direction for future analysis

Decision Details

Revise the measure descriptions to include/allow “New Construction”; measure status to remain as "Under Review for compliance with Guidelines (Develop new, separate measures for New Construction after SBW review and when updating all heat pump and Wx measures with SEEM94).

An RTF contractor is currently reviewing these measures for compliance with the Guidelines. Also, these measures will be re-run with SEEM94.

Decided 
August 03, 2010
RTF Meeting: August 3, 2010

Approve measure update

Decision Details

The RTF accepted the deemed measure updates for existing manufactured homes.