rtf logo
 
CategoryDescription
(none)Measures without a Category have not been approved by the RTF, but they are listed here because they have been considered by the RTF.
(tbd)
PlanningUpon request, the RTF will consider the proposed planning measure and formulate a consensus opinion on the likely UES values. This process is intended to promote consistent treatment of these measures throughout the region. The RTF will also review and comment on any proposed research design for collecting data needed to support Provisional or Proven UES values. The review will only be provided if the section 3.2.1 UES quality criteria for Planning measures are satisfied. Measure specifications (section 2) and the information described in the Guidleines for UES measures must be provided before this review can commence.
ProvenMeasures can obtain approval for Proven status if the section 3.2.3 UES quality criteria for Proven measures are satisfied. Sunset criteria will be assigned by the RTF along with a plan for data collection and analysis that allows the UES estimate to be reviewed and updated in a timely fashion.
ProvisionalMeasures can obtain Provisional approval if the section 3.2.2 UES quality criteria for Provisional measures are satisfied. In addition, it must be possible during the provisional period to obtain the data and analyses needed to meet the Proven quality criteria (3.2.3). The data and analyses may come from programs delivering the measure or from other studies. The plan for completing the necessary data collection and analyses must be approved along with the provisional UES estimates. In addition, sunset criteria must be adopted that are consistent with the plan. For measures that require long periods to collect and analyze baseline and efficient case data, the plan should include staged analyses so that early experience with deployment, baseline conditions, and measure performance can be used to adjust the sunset criteria.
Small SaverThe RTF may determine that the likely savings from a measure are too small to warrant the resources needed to meet the section 3.2 UES quality criteria for Provisional or Proven status. In making this determination, the RTF will consider the size of the regional end use that is affected by the measure or the magnitude of the likely savings. Measure specifications (section 2) and the information described above for the proposed stage is required for small savers and must be provided before the RTF can designate a measure as a small saver. For small savers, the RTF may choose to convene an expert panel to consider the proposed measure and to formulate a consensus opinion on the likely UES values. This process is intended to promote consistent treatment of these measures throughout the region.
StatusDescription
(none)The RTF has not set a status for these measures either because they have not been assigned a category or because they were deactivated prior to receiving a status.
(Under review for compliance w/ RTF Guidelines)These measures' energy savings were "deemed" by the RTF prior to operating under the new RTF Guidelines. The RTF plans to review these measures under the Guidelines by the end of 2012. During this transition period, the RTF intends for these measures to continue to be considered "RTF-approved."
ActiveThese measures have received approval by the RTF and have no other associated review pending.
DeactivatedIf the sunset criteria are met, and the new or revised UES estimates have not been approved, the RTF will deactivate the measure. This means that the UES estimates are no longer approved by the RTF. The RTF may decide to deactivate a measure before the sunset criteria is satisfied based on unanticipated factors, such as the adoption of new energy codes or the release of study results with findings that invalidate the UES values or the procedures for estimating those values.
Out-of-complianceThe RTF may determine that measures approved prior to the adoption of these guidelines do not comply with one or more requirements of these guidelines. The UES estimates for these measures will continue to be “RTF-Approved” if a plan for bringing the measure into compliance is approved by the RTF within one year following the RTF determination that the measure is out-of-compliance. If no plan is approved within one year, the measure will be de-activated. The RTF intends that all out-of-compliance measures will be reclassified, i.e., become a standard protocol or be placed in one of the UES measure development stages of small saver, planning, provisional, de-activated or active, as soon as possible, but no later than five years following the adoption of these guidelines.
Under ReviewAt any time prior to the sunset criteria being met, the RTF may decide to place a measure under review. This may be the result of a review of the UES savings estimation procedure or the availability of new sources of information for baseline or efficient-case consumption. The UES values will remain “RTF-Approved” while the measure is under review. As a result of the review, the UES values may be re-estimated and the measure sunset criteria revised.

RTF Unit Energy Savings (UES) Measures and Supporting Documentation

Staff only:

SectorMeasureCategory (?)Status (?)Latest RTF DecisionSunset DateMeasure Life
AgriculturalIrrigation Hardware - Irrigation HardwareSmall SaverActive4/16/20134/30/20184 to 15
AgriculturalMotor Rewind - Green Motor RewindSmall SaverActive4/16/201310/31/201714 to 20 years
AgriculturalMotors - Efficient Motors Replacement(none)Deactivated9/18/201215
AgriculturalStock Watering TanksSmall SaverActive4/16/20135/31/201810
AgriculturalVariable Frequency Drives - DairyProvenOut-of-compliance10/24/201211/30/201310
AgriculturalVariable Frequency Drives - Potato/Onion ShedProvenOut-of-compliance10/24/201211/30/201310
CommercialAppliances - Clothes WashersProvenActive4/16/20135/31/20157
CommercialAppliances - DishwashersProvenOut-of-compliance10/24/201211/30/201312
CommercialAppliances - FreezersProvenActive10/24/20121/31/201612
CommercialAppliances - Ice MakersProvenOut-of-compliance10/24/201211/30/201310
CommercialAppliances - Refrigerator/Freezer DecommissioningProvenOut-of-compliance1/23/20131/31/20146 to 9
CommercialAppliances - RefrigeratorsProvenActive10/24/20121/31/201612
CommercialCooking Equipment - Combination OvensSmall SaverUnder Review10/24/20127/31/201312
CommercialCooking Equipment - Convection OvensSmall SaverUnder Review10/24/20127/31/201312
CommercialCooking Equipment - FryersSmall SaverUnder Review10/24/20127/31/201312
CommercialCooking Equipment - Hot Food Holding CabinetsSmall SaverUnder Review1/23/20137/31/201312
CommercialCooking Equipment - Pre-Rinse Spray ValvesSmall SaverUnder Review12/11/201212/31/20134
CommercialCooking Equipment - SteamersSmall SaverUnder Review1/23/20137/31/201312
CommercialDHW - Efficient TanksProvenOut-of-compliance10/24/201211/30/201315
CommercialDHW - ShowerheadsSmall SaverActive4/16/20134/30/201810
CommercialEfficient Computers(none)(none) 
CommercialGrocery - Anti-sweat Heater ControlsProvenOut-of-compliance4/17/20126/30/2013 
CommercialGrocery - AutoclosersProvenOut-of-compliance12/11/201212/31/2013 
CommercialGrocery - Compressor Head Fan Motor Retrofit to ECMProvenOut-of-compliance12/11/201212/31/2013 
CommercialGrocery - Display Case LEDs (Open Cases)ProvenOut-of-compliance1/23/20131/31/20156
CommercialGrocery - Display Case LEDs (Reach-In Cases)ProvenActive12/11/20126/30/20154 to 6
CommercialGrocery - Display Case Motion SensorsProvenOut-of-compliance4/17/20124/30/20138
CommercialGrocery - Door Gasket ReplacementProvenOut-of-compliance12/11/201212/31/2013 
CommercialGrocery - ECMs for Display CasesProvenActive12/11/20126/30/20155
CommercialGrocery - ECMs for Walk-insProvenOut-of-compliance10/24/201211/30/2013 
CommercialGrocery - Floating Head Pressure Controls for Single Compressor SystemsProvenOut-of-compliance12/11/201212/31/201315
CommercialGrocery - Lighting - CFLsProvenOut-of-compliance10/24/201211/30/2013 
CommercialGrocery - Lighting - T8sProvenOut-of-compliance10/24/201211/30/2013 
CommercialGrocery - Night Covers(none)Deactivated8/30/2011 
CommercialGrocery - PSC MotorsProvenDeactivated1/23/2013 
CommercialGrocery - Rooftop Unit Supply Fan VFDsProvenOut-of-compliance1/23/20131/31/201415
CommercialGrocery - Strip CurtainsProvisionalOut-of-compliance1/23/20131/31/20144
CommercialGrocery - Vending Machine ControllerProvenOut-of-compliance1/23/20131/31/2014 
CommercialGrocery - Visi-CoolerProvenOut-of-compliance1/23/20131/31/2014 
CommercialGrocery - Walk-in Evaporator Fan ECM Motor ControllersProvenOut-of-compliance12/11/201212/31/201315
CommercialGrocery - Walk-in Evaporator Fan Shaded-Pole Motor ControllersProvenOut-of-compliance12/11/201212/31/2013 
CommercialGrocery - Walk-in/Reach-in Door RetrofitProvenOut-of-compliance1/23/20131/31/2014 
CommercialNew Construction - Energy Smart Design Small Office(none)Deactivated7/17/201216 to 22
CommercialNon-Res - Network Computer Power ManagementProvenActive6/28/20117/31/20134
CommercialSmart Plug Power StripsProvenActive10/4/201110/31/20144
CommercialStreet Lighting - Street Lighting(none)(none) 
CommercialTraffic Signals - LED Traffic SignalsProvenActive5/15/20129/30/20143.7 to 16.4
CommercialWeatherization - Small Commerical(none)(none) 
IndustrialMotor Rewind - Green Motor RewindSmall SaverActive4/16/201310/31/20177 to 9 years
IndustrialMotors - Efficient Motor Replacement(none)Deactivated2/1/201115
ResidentialAppliances - Clothes Washers in MF(none)(none)14
ResidentialAppliances - Clothes Washers in SFProvenActive11/14/201211/30/201314
ResidentialAppliances - DishwashersProvenActive12/11/20125/31/201415.4 years - based on DOE TSD
ResidentialAppliances - FreezersProvenActive11/14/20123/31/201420
ResidentialAppliances - Refrigerator/Freezer DecommissioningProvenActive12/11/20126/30/20145 to 7 years
ResidentialAppliances - RefrigeratorsProvenActive4/16/20134/30/201520
ResidentialAppliances - Televisions(none)(none)5/31/201510
ResidentialDHW - Drain Waste Heat RecoveryProvisionalOut-of-compliance10/24/201211/30/201340
ResidentialDHW - Efficient TanksProvenActive9/18/20124/30/201515
ResidentialDHW - HPWHProvisionalActive2/14/201212/31/201415
ResidentialDHW - ShowerheadsProvenActive6/1/20116/30/201610
ResidentialHeating/Cooling - Air Source Heat Pump Conversions MHProvenUnder Review12/11/201212/31/201320
ResidentialHeating/Cooling - Air Source Heat Pump Conversions SFProvenActive5/15/20125/31/201620
ResidentialHeating/Cooling - Air Source Heat Pump Upgrades MHProvenUnder Review10/24/20125/31/201320
ResidentialHeating/Cooling - Air Source Heat Pump Upgrades SF (Existing Construction)ProvenActive1/23/20138/31/201515 years (based on DEER 2008)
ResidentialHeating/Cooling - Air Source Heat Pump Upgrades SF (New Construction)ProvenActive1/23/20138/31/201515 years
ResidentialHeating/Cooling - Ductless Heat Pumps MF(none)(none) 
ResidentialHeating/Cooling - Ductless Heat Pumps SFProvisionalUnder Review4/17/20129/30/201320
ResidentialHeating/Cooling - Electronic ThermostatsProvenActive5/3/20115/31/201615
ResidentialHeating/Cooling - Ground Source Heat Pump UpgradesProvenActive10/4/20118/31/201620
ResidentialHeating/Cooling - PTCS Commissioning, Controls, & Sizing MHProvenOut-of-compliance10/24/201211/30/201320
ResidentialHeating/Cooling - PTCS Commissioning, Controls, & Sizing SFProvenUnder Review11/14/201212/31/201320
ResidentialHeating/Cooling - PTCS Duct Sealing MHProvenActive11/14/20128/31/201520
ResidentialHeating/Cooling - PTCS Duct Sealing SFProvenActive5/3/20115/31/201620
ResidentialHeating/Cooling - PTCS Ducts InsideProvenUnder Review12/11/201212/31/201325
ResidentialHeating/Cooling - Room Air Conditioners(none)Deactivated5/15/20129
ResidentialHeating/Cooling - Variable Speed ASHP Conversions SFProvisionalActive9/18/201212/31/201420 years
ResidentialHeating/Cooling - Variable Speed ASHP Upgrades SFProvisionalActive9/18/201212/31/201420 years
ResidentialLighting - CFLsProvenActive8/30/201112/31/20133 to 15
ResidentialLighting - LED Holiday Strings(none)Deactivated5/15/2012 
ResidentialLighting - LEDsProvenActive2/20/20134/30/201412 (Based on RTF judgment of unproven technology)
ResidentialLighting - Specialty CFLsProvenActive12/11/20121/30/20145 to 12
ResidentialNew Construction - Built Green WashingtonProvenUnder Review12/11/201212/31/20137 to 70
ResidentialNew Construction - Energy Star and Ecorated Homes MHProvenUnder Review1/23/201312/31/20138 to 27
ResidentialNew Construction - Energy Star Homes MFProvenActive9/18/201210/31/2014 
ResidentialNew Construction - Energy Star Homes SF - ID/MT BOP2ProvenActive12/7/201012/31/20136 to 45 years
ResidentialNew Construction - Energy Star Homes SF - Oregon 2009(none)Deactivated11/1/2011Latest
ResidentialNew Construction - Energy Star Homes SF - Oregon 2012ProvenActive11/1/201115 - 66 years
ResidentialNew Construction - Energy Star Homes SF - WA/ID/MTProvenUnder Review12/11/201212/31/20137 to 70
ResidentialNew Construction - Energy Star Homes SF - WA/ID/MT DHP TCO (provisional)ProvenActive12/7/201012/31/20136 to 45 years
ResidentialNew Construction - High Performance Manufactured HomeProvisionalActive5/15/201212/31/2014 
ResidentialNew Construction - Montana House(none)Deactivated2/1/201122 to 40
ResidentialNew Construction - Montana House 2ProvenActive6/28/20117/31/201427 to 63
ResidentialNew Construction - Multifamily Low Rise(none)Deactivated3/1/2011 
ResidentialNew Construction - Slab InsulationProvenUnder Review12/11/201212/31/201370
ResidentialSmart Plug Power Strips(none)Deactivated7/17/20124
ResidentialWeatherization - Manufactured HomeProvenActive3/13/20122/28/201725
ResidentialWeatherization - Multi-FamilyProvenOut-of-compliance11/1/20118/31/2015 
ResidentialWeatherization - Single FamilyProvenActive3/13/20125/31/201645