Residential: Heating/Cooling - PTCS Duct Sealing MH | |||||
| Category | Proven Measures can obtain approval for Proven status if the section 3.2.3 UES quality criteria for Proven measures are satisfied. Sunset criteria will be assigned by the RTF along with a plan for data collection and analysis that allows the UES estimate to be reviewed and updated in a timely fashion. | ||||
| Status | Active These measures have received approval by the RTF and have no other associated review pending. | ||||
| Sunset date | 2015-08-31 | ||||
Measure workbook (show/hide history) |
|||||
| Version | Note | Category | Status | Decision date | |
| 11/14/2012 | 2.4 | Updated per recommendation memo | |||
| 4/17/2012 | 2.3 | added Summary tab | |||
| 2/17/2011 | 2.2 | Error in return duct leakage inputs to SEEM runs corrected | |||
| 12/1/2010 | 2.1 | ||||
Recommendation memos |
|||||
| 4/17/2012 | This measure category should be re-classified as under review. Additional documentation for key parameters is needed and the savings runs need to be reanalyzed using SEEM94. Once these and documentation issues are resolved it can be returned to the active classification. | ||||
Technical specifications |
|||||
| 7/12/2011 | v2.0 | ||||
Program specifications |
|||||
| 7/12/2011 | PTCS Materials | ||||
Small/rural checklist |
|||||
| 3/1/2013 | Small/Rural UES Design Checklist | ||||
RTF decisions |
|||||
| Decision (show decision details) | |||||
| 11/14/2012 | Approve the updated analysis for the Residential Manufactured Housing PTCS Duct Sealing UES measure and change the measure's status to Active, with a sunset date of August 2, 2015. |
||||
| 4/17/2012 | Approve Residential Manufactured Housing Duct Sealing status to under review. |
||||
login to post commentsMore discussion / future updates | |||||