Residential: Heating/Cooling - Air Source Heat Pump Upgrades MH | |||||
| Category | Proven Measures can obtain approval for Proven status if the section 3.2.3 UES quality criteria for Proven measures are satisfied. Sunset criteria will be assigned by the RTF along with a plan for data collection and analysis that allows the UES estimate to be reviewed and updated in a timely fashion. | ||||
| Status | Under Review At any time prior to the sunset criteria being met, the RTF may decide to place a measure under review. This may be the result of a review of the UES savings estimation procedure or the availability of new sources of information for baseline or efficient-case consumption. The UES values will remain “RTF-Approved” while the measure is under review. As a result of the review, the UES values may be re-estimated and the measure sunset criteria revised. | ||||
| Sunset date | 2013-05-31 | ||||
Measure workbook (show/hide history) |
|||||
| Version | Note | Category | Status | Decision date | |
| 10/24/2012 | 2.5 | Summary sheet added | |||
| 5/30/2012 | 2.4 | Clarified that measure is applicable to single and two-speed compressors. | |||
| 3/13/2012 | 2.3 | updated per 2/14/2012 RTF decision to include new construction in measure application. | |||
| 2/17/2011 | 2.2 | ||||
| 9/27/2010 | 2.1 | ||||
Recommendation memos |
|||||
| 10/24/2012 | The status of this measure should be changed to Under Review. | ||||
Technical specifications |
|||||
| 7/12/2011 | v2.0 | ||||
Program specifications |
|||||
| 7/12/2011 | PTCS Materials | ||||
RTF decisions |
|||||
| Decision (show decision details) | |||||
| 10/24/2012 | Adopt the SBW recommendations (as revised during today's meeting) for the Residential Manufactured Housing Air Source Heat Pump Upgrades measure and change the status to Under Review with a sunset date of May 1, 2013. |
||||
| 5/15/2012 | Clarify eligibility requirements for (central system) heat pump UES measures so as to limit eligibility to single speed and two speed compressor systems. |
||||
| 2/14/2012 | Revise the measure descriptions to include/allow “New Construction”; measure status to remain as "Under Review for compliance with Guidelines" (Develop new, separate measures for New Construction after SBW review and when updating all heat pump and Wx measures with SEEM94). |
||||
login to post commentsMore discussion / future updates | |||||